"HOW TO REDUCE PLASTERING COST IN CEILING AND ROOFS"
I WILL POST ALL OF THIS IN THE FORM OF POINTS SO THAT IT WILL BE EASE TO USE
- FIRST THING IS TO CHECK FOR THE MASONARY WORK IS COMPLETE
- AND THEN TO CHECK ALL THE WALLS EVEN TO THE TUBE LEVEL OR TO THE REQURIED MEASUREMENT
- THE ASK YOUR FORM WORK PERSON OR THE CENTRING MAN TO HELP YOU PROVIDE A EVEN FORM WORK
- IF THE FORM WORK IS NOT GOOD AND EVEN THEN YOU NEED TO SPEND MORE MONEY ON GETTING THE EVEN WORK DONE WHERE LOT OF MONEY AND TIME WILL BE SPENT
- AFTER THE FORM WORK IS COMPLETED CHECK FOR ALL THE GAPS IN THE FORM WORK AND COMPLETELY FILL ALL GAPS
- IF THE GAPS ARE NOT FILLED PROPERLY THEN HUGE AMOUNT OF CONCRETE IS WASTED
- SO KEEP AN CLOSE EYE THIS THINGS
- IF THESE THINGS ARE TAKEN CARE CLOSELY THEN HALF OF THE MONEY IS SAVED
- SO AFTER THE CONCRETE WORK IS COMPLETE ALLOW THE CONCRETE TO SETTLE DOWN FOR A TIME PERIOD OF 21 DAYS
- SO WHEN THE FORM WORK IS REMOVED CHECK FOR ALL THE OUT FLOW OF CONCRETE AND REMOVE THEM EVEVNLY
- AND THEN RUBE THE WHOLE SURFACE WITH SCRUB AND REMOVE ALL TINY DUST AND WASH IT WITH WATER
- AND AFTER ALL OF THE WORK IS DONE YOU CAN SPEND MONEY ON REGULAR FORM OF PLASTERING WORK OF RATIO 1:3 CEMENT:SAND PROPOSTION AND COMPLETE THE WORK
- IN REGULAR FORM OF PLASTERING WE NEED TO SPED LOT OF MAN POWER AND MATERIAL AND TIME AND MONEY
- SO AS YOU HAVE TAKEN TIME IN MAKING THE ROOF EVEN
- YOU CAN APPLY WALL PUTTY TO ROOF AND YOU CAN MAKE IT MORE EVEN AND VERY SMOOTH
- AND AFTER THE WORK IS DONE YOU CAN SEE A GOOD SMOOTH AND EVEN ROOF
- EXAMPLE 10*10 ROOF REQURIES 2 MASIONS AND 3 HELPERS AND 2 BAGS OF CEMENT AND 20 BAGS OF FINE SAND AND 1 DAG FOR THE FORM WORK
- EXAMPLE 10*10 ROOF REQURIES 1 PAINTER 1 PUTTY BAG 1 STAND 2 DAYS
No comments: