"HOW TO REDUCE PLASTERING COST IN CEILING AND ROOFS"


I WILL POST ALL OF THIS IN THE  FORM OF POINTS SO THAT IT WILL BE EASE TO USE

  1. FIRST THING IS TO CHECK FOR THE MASONARY WORK IS COMPLETE 
  2. AND THEN TO CHECK ALL THE WALLS EVEN TO THE TUBE LEVEL OR TO THE REQURIED MEASUREMENT
  3. THE ASK YOUR FORM WORK PERSON OR THE CENTRING MAN TO HELP YOU PROVIDE A EVEN FORM WORK 
  4. IF THE FORM WORK IS NOT GOOD AND EVEN THEN YOU NEED TO SPEND MORE MONEY ON GETTING THE EVEN WORK DONE WHERE LOT OF MONEY AND TIME WILL BE SPENT
  5. AFTER THE FORM WORK IS COMPLETED CHECK FOR ALL THE GAPS IN THE FORM WORK AND COMPLETELY FILL ALL GAPS
  6. IF THE GAPS ARE NOT FILLED PROPERLY THEN HUGE AMOUNT OF CONCRETE IS WASTED 
  7. SO KEEP AN CLOSE EYE THIS THINGS
  8. IF THESE THINGS ARE TAKEN CARE CLOSELY THEN HALF OF THE MONEY IS SAVED

  9. SO AFTER THE CONCRETE WORK IS COMPLETE ALLOW THE CONCRETE TO SETTLE DOWN FOR A TIME PERIOD OF 21 DAYS
  10. SO WHEN THE FORM WORK IS REMOVED CHECK FOR ALL THE OUT FLOW OF CONCRETE AND REMOVE THEM EVEVNLY
  11. AND THEN RUBE THE WHOLE SURFACE WITH SCRUB AND REMOVE ALL TINY DUST  AND WASH IT WITH WATER
  12. AND AFTER ALL OF THE WORK IS DONE YOU CAN SPEND MONEY ON REGULAR FORM OF PLASTERING WORK OF RATIO 1:3 CEMENT:SAND PROPOSTION AND COMPLETE THE WORK
  13. IN REGULAR FORM OF PLASTERING WE NEED TO SPED LOT OF MAN POWER AND MATERIAL AND TIME AND MONEY

  14. SO AS YOU HAVE TAKEN TIME IN MAKING THE ROOF EVEN
  15. YOU CAN APPLY WALL PUTTY TO ROOF AND YOU CAN MAKE IT MORE EVEN AND VERY SMOOTH 
  16. AND AFTER THE WORK IS DONE YOU CAN SEE A GOOD SMOOTH AND EVEN ROOF

  17. EXAMPLE 10*10 ROOF REQURIES 2 MASIONS AND 3 HELPERS AND 2 BAGS OF CEMENT AND 20 BAGS OF FINE SAND AND 1 DAG FOR THE FORM WORK 

  18. EXAMPLE 10*10 ROOF REQURIES 1 PAINTER 1 PUTTY BAG 1 STAND 2 DAYS